Fibre Glass Processors
Back to Engineering InsightsFGP Technical Bulletin
1 min read·Lining ServicesCorrosion ResistanceQuality Assurance

FRP Chemical Lining & Relining: Extending the Life of Steel and Concrete Tanks

Authored by FGP Technical Engineering Desk·ISO 9001:2008 Certified Facility · Rajkot, Gujarat

23+ years

60,000 sq ft plant

27+ products

ISO 9001:2008 certified

The Problem

A steel or concrete tank that's corroding from the inside doesn't always need replacing. Replacement means downtime, a new foundation in some cases, and capital cost that a lining can avoid — if the lining itself is built to a standard that actually holds up in service, not just applied and hoped for.

How We Engineer It

Our lining work uses high-integrity vinyl ester barrier systems, applied on-site or in-shop to the interior of the existing vessel, and every completed lining is verified with a 25 kV spark test before the tank goes back into service — a direct pass/fail check for pinholes and thin spots, not a visual inspection standing in for one.

Why It Matters

A spark-tested lining is a different commitment than a coating applied and left to prove itself over the following year. It catches the specific failure mode — a breach in the barrier — before the tank is back in chemical service, which is exactly when that failure mode is expensive to discover.

The Result

For concrete tanks especially, this is often the more practical path entirely: concrete can't be filament-wound into a new vessel, but it can be lined to the same chemical-resistance standard as one — extending service life on infrastructure that would otherwise need to be demolished and rebuilt.

Engineering discipline

Engineering decisions we evaluate on every industrial build

No two chemical or structural specifications are identical, even at the same nominal capacity. Every FGP custom equipment project systematically resolves:

  • Capacity & working volume margins
  • Resin chemistry (Isophthalic vs Vinyl Ester vs Dual Laminate)
  • Laminate thickness & structural hoop stress calculation
  • Specific chemical concentration & operating temperature limits
  • Design standard compliance (BS 4994, ASTM D3299, ASTM D4097)
  • Nozzle orientation, manway positioning & installation constraints
  • Design life expectancy & preventive inspection protocol

Engineering consultation

Apply this engineering standard to your project

Share your project parameters with our Rajkot engineering desk — capacity, chemical exposure, operating temperature, and site layout — and we will calculate laminate specifications and provide a factory quotation.

Get in touch

Ready to engineer your composite equipment?
Consult directly with our plant engineers.

Over 23 years of proven composite engineering in Rajkot, Gujarat. We review CAD drawings, chemical media, and operating constraints.