Fibre Glass Processors
FRP chemical storage tanks installed at an industrial plant

Heavy-duty FRP tanks built for your toughest chemicals.

ISO 9001:2008 certified manufacturer of FRP tanks, scrubbers, piping and composite process equipment in Rajkot, Gujarat, since 2003.

Factory building with a teal roof and white office block under a blue sky

Manufacturer

Built in Rajkot. Proven across demanding industries.

Every FRP vessel is engineered, manufactured and inspected at our Kuwadwa facility before dispatch.

  • 23+

    Years in FRP

    Manufacturing since 2003

  • 500+

    Projects delivered

    Pan-India & export supply

  • 60,000sq ft

    Manufacturing facility

    Kuwadwa, Rajkot

  • 27+

    Product solutions

    Tanks, piping, scrubbers and more

  • 100,000L

    Maximum tank size

    Custom-wound, ASTM D3299

Trusted across chemical, energy, water and export sectors — see our global reach

  • Fluor
  • Cairn
  • Essar
  • Gujarat Fluorochemicals (GFL)
  • Inox Fabrications
  • Reliance Industries
  • Tata Chemicals
  • WABAG
  • Veolia
  • Shapoorji Pallonji
  • Tüpraş
  • Panoli Intermediates
ISO 9001:2008ASTM D3299BS 4994EN 13121ASME RTP-1

Why FGP

What you get when you choose FGP.

Scrubber performance

99.8%+

acidic and toxic gas removal from our packed-bed FRP scrubbers, up to Ø 4.5 m.

Two installed FRP fume scrubber towers with exhaust stacks, blowers and ducting alongside a factory building

CNC filament winding

Computerised helical winding and contact moulding for tanks, vessels, scrubbers and ducting, on mandrels from Ø 100 mm to Ø 4,500 mm.

Tested before dispatch

100% pre-dispatch inspection, Barcol hardness testing and spark or hydro proofing on every vessel.

Engineered to the application

Resin system, wall thickness and nozzle orientation chosen for your chemical exposure, pressure and site, from review to delivery.

Process

Four steps from your order to delivery.

  1. 01

    Application Review

    Chemical exposure, pressure, capacity, and installation constraints reviewed first.

  2. 02

    Material Selection

    Resin, wall thickness, and construction method matched to the operating envelope.

  3. 03

    Winding & Lay-Up

    Built at our Kuwadwa facility via filament winding and hand lay-up.

  4. 04

    Quality Check

    Checked against our quality process before dispatch.

Facility

Inside our Kuwadwa plant.

A 60,000 sq ft plant in Rajkot, opened in 2020. Winding, lay-up, finishing and inspection all happen under one roof.

  • Inside the FGP production hall: finished FRP vessels and horizontal tanks under an overhead gantry crane
    Production hall under the gantry crane
  • Freshly filament-wound FRP pressure vessel shell, before gelcoat and finishing, on the shop floor
    Filament-wound shell before finishing
  • Filament winding machine wrapping glass-fiber roving onto a tank shell mandrel, spools of roving in the foreground
    Filament winding
  • Large horizontal FRP tank with yellow resin topcoat freshly applied over half its shell, paintbrush resting on the paint can
    Topcoat finishing
  • Dial caliper measuring the wall thickness of an FRP tank, showing the laminate's woven glass-fiber texture
    Laminate thickness check

Delivery

From our floor to your site.

Every vessel is crane-handled, wrapped for road or sea freight and delivered ready to erect, in India and abroad.

  1. 15 KL FRP storage tank with caged ladder loaded on a trailer for road dispatch01

    Loaded for dispatch

    A 15 KL tank strapped onto a trailer, ready for road delivery.

  2. Wrapped horizontal FRP vessel being slung into an export container at the FGP plant02

    Packed for export

    A shrink-wrapped vessel slung from an overhead crane, ready for the shipping container.

  3. Mobile crane erecting a blue FRP scrubber tower onto its foundation at the client site03

    Erected on site

    A scrubber tower set onto its foundation by mobile crane.

  4. FRP-lined conical hoppers installed beneath a row of steel silos at an industrial site in Punjab04

    In service

    FRP conical hoppers installed beneath a row of steel silos in Punjab.

Case studies

Proven on site.

  • Mobile crane erecting a blue FRP scrubber tower onto its foundation at the client siteCase study

    Fume scrubber tower · Erected by mobile crane

    How a fume scrubber tower gets onto its foundation.

  • Long row of FRP mould beds laid out in a precast casting yardCase study

    FRP precast moulds · Reliance

    Precast moulds laid out for Reliance.

  • FRP panel water tank installed on a building terrace in Gurgaon, photographed at duskCase study

    FRP panel water tank · Felix · Gurgaon

    A water tank on a Gurgaon terrace, installed on site.

Milestones

Growing step by step since 2003.

  1. 2003

    Fibre Glass Processors is incorporated in Rajkot, Gujarat.

  2. 2006

    Set up production of high-pressure FRP tanks.

  3. 2008

    Achieved ISO 9001:2008 quality-management certification.

  4. 2010

    Shipped the first major export order of GRP tanks.

  5. 2014

    Started making FRP moulds for RCC precast elements.

  6. 2018

    Supplied chlor-alkali projects working under thyssenkrupp.

  7. 2020

    Opened a new 60,000 sq ft plant at Kuwadwa, Rajkot.

  8. 2021

    Won a major export order for chlor-alkali equipment.

Get started

Tell us what you need to store. We'll build the tank.

Share your capacity, pressure and process media. Our engineers respond with a proposal.

Need a detailed technical quote? Request a Quote

Send us your requirement

Replies within 4 business hours

Interested in

All fields are required.

  • ISO 9001:2008
  • ASTM D3299
  • BS 4994
  • EN 13121
  • ASME RTP-1